| Drawing of Record Submitted | 4/3/2008 |
|---|---|
| Electronic Drawing | 4/3/2008 |
| Final Grading Report | 4/3/200/ |
| Date Scheduled | 4/7/2008 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 4/7/08 corrections required per Carson Tait. Need to test and tag the backflow assemblies on the irrigation systems. 4/28/2008 Approved per Carson Tait 6/15/2009 Approved per Carson Tait.. 1 year warranty |
| Wastewater | 4/7/08 corrections required per Carson Tait. Need to test and tag the backflow assemblies on the irrigation systems. 4/28/2008 Approved per Carson Tait 6/15/2009 Approved per Carson Tait.. 1 year warranty |
| Engineering | 4/9/08 approved per Brandon W. 1 cylinder test shown for project. Private owner responsible for failed tests. 4/3/2009 Corrections required Per Brandon Wright..1 year warranty.. Water trench in Factory Drive needs to be sealed West Drive approach needs to be Sicaflexed on West side of radius |
| City Development Engineer | 4/7/08 corrections required per Cathy H. Electronic DWG of record needs to show how the 3 detention basins drain to public facilities. per Ken B. Gas meter guard rail has not been set, perimeter fencing not complete 4/25/08 corrections required per Ken B. Missing stop sign at access. Chain link fence at front must be replaced with solid non-see thru fencing. 5/6/08 approved per Ken B. Fence okay per approved site plan. Signs okay per approved site plan. 4/1/09 - 1 year warranty - private improvements only - NA per Cathy H. |
| Landscaping | 4/7/08 corrections required per Ken B. Gas meter guard rail has not been set, perimeter fencing not complete. 4/25/08 approved per Cathy H. 4/15/09 - 1 YEAR WARRANTY - approved per Pam Klotz |
| General Comments: | |