[Estates @ Hidden Valley City Park Phase 4]
Number: Grading-39068

Drawing of Record Submitted 2/22/2008
Electronic Drawing 2/22/2008
Final Grading Report 2/22/2008
Date Scheduled 2/25/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 2/25/2008 Corrections required per Carson Tait.. Need a larger (next size larger) meter box. on the culinary water meter. 3/24/2008 Approved per Carson Tait 0/6/2009 Corrections required per Carson Tait.. 1 year warranty.. wire good in road on front of par. need back flow protection on splash pad
Wastewater 2/25/2008 Corrections required per Carson Tait.. Need a larger (next size larger) meter box. on the culinary water meter. 3/24/2008 Approved per Carson Tait 0/6/2009 Corrections required per Carson Tait.. 1 year warranty.. wire good in road on front of par. need back flow protection on splash pad
Engineering 2/28/2008 Approved per Carlos Robles
City Development Engineer 2/25/08 corrections required per Cathy H. Electronic DWG of record (As-built) needs to show sewer lateral connected to restroom and waterline to splash pad area. 3/12/2008 Approved per Cathy H 2/27/09 - 1 year warranty - corrections required per Ken B. (Check Barcelona Drive in front of Hidden Valley Park Project) - Side is cracked at 4 sections in front at parking area. Full width and depth gutter cracks (3). Crack and chipping at ADA ramp North (3). Full width and depth curb cracks (3). Curb and sidewalk are chips and spauling. Several areas need reapir and replace).
Landscaping 2/25/08 corrections required per Millie Cockerill. Substantial completion walk-through punch list includes items related to restroom, irrigation sy stem, park site and trail from Desert Hills Dr to Hidden Valley Park. (38) punch list items. 3/12/2008 Approved per Ken Bricker 2/11/2009 Corrections required per Millie C... 1 year warranty.. Playground surfacing cracking & lifting, re-check splash pad tower after surfacing repaired,(3 places). Vent control room (one high & one low) repair cracks and edge on basketball court, repair cracks & edge on tennis courts, repair restroom stucco & sticky doors(2.)
    
General Comments: