[Tonaquint Valley Phase 2]
Number: Grading-39095

Drawing of Record Submitted 2/9/2009
Electronic Drawing 2/9/2009
Final Grading Report 2/9/2009
Date Scheduled 2/10/2009
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 2/17/2009 Approved per Dennis Wright 1/28/2010 Approved per Dennis Wright.. 1 year warranty
Water 2/9/2009 Approved per Kevin Condie 2/1/10 - 1 year warranty - CORRECTIONS REQUIRED per Kevin C. May have water or storm drain leak. (2) sidewalk areas are dropped by meter boxes. 2/11/2011 Approved per Kevin Condie.. 1 year warranty
Wastewater 2/9/2009 Approved per Kevin Condie 2/1/10 - 1 year warranty - CORRECTIONS REQUIRED per Kevin C. May have water or storm drain leak. (2) sidewalk areas are dropped by meter boxes. 2/11/2011 Approved per Kevin Condie.. 1 year warranty
Engineering 2/10/2009 Corrections required per Brandon Wright.. Monuments not in and stamped, finish rock walls per plan 2/1/10 - 1 year warranty - CORRECTIONS REQUIRED per Brandon W. Pads need to be finished. Rock walls need to be finished. Road failing. 2/11/2011 Approved per Brandon Wright.. 1 year warranty
City Development Engineer 2/10/2009 Corrections required per Cathy H.. 1. 10% Warranty Bond, 2. rock wall certifications, 3. Electronic Dwg of record need to show all walls in developemnt as-constructed. 2/1/10 - 1 year warranty - CORRECTIONS REQUIRED per Cathy H. Pads need to be finished. Rock walls need to be finished. Road failing. 2/14/2011 Approved per Brett Bingham.. 1 year warranty
Landscaping 2/9/2009 Approved per Larry Shane 2/1/10 - 1 year warranty - approved per Ken B.
    
General Comments: