Drawing of Record Submitted |
4/25/2008 |
Electronic Drawing |
4/25/2008..5/8/2008 |
Final Grading Report |
4/25/2008 |
Date Scheduled |
4/29/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
4/30/2008 Corrections required per Kevin Condie.. 1. 2 spot with wire problems, 2. Check all valve on Angel Arch & in phase 30 3. Air Vac leaking. 4. valve at Sun River Parkway & Angel Arch need to be concrete in I've ask for 2 years has not been done.
5/7/2008 Approved per Kevin Condie
5/11/2009 Corrections required per Kevin Condie.. 1 year warranty.. Paint hydrants
6/9/2009 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
4/30/2008 Corrections required per Kevin Condie.. 1. 2 spot with wire problems, 2. Check all valve on Angel Arch & in phase 30 3. Air Vac leaking. 4. valve at Sun River Parkway & Angel Arch need to be concrete in I've ask for 2 years has not been done.
5/7/2008 Approved per Kevin Condie
5/11/2009 Corrections required per Kevin Condie.. 1 year warranty.. Paint hydrants
6/9/2009 Approved per Kevin Condie.. 1 year warranty |
Engineering |
5/5/2008 Approved per Carlos Robles
5/6/2009 Approved per Carlos Robles 1 year warranty |
City Development Engineer |
4/29/08 corrections required per Cathy H . Electronic DWG of record - shift into HCN system (off some to the Southwest). Per Ken B - dirt piles across sidewalks, heavy equipment sitting on street, construction materials in the street.
5/8/08 (Elec Dwg of record okay)Per Cathy H.
5/8/08 approved per Cathy H
4/3/2009 Approved per Cahty H.. 1 year warranty..Note: Check public street-Angel Arch Drive |
Landscaping |
4/29/08 corrections required Per Ken B - dirt piles across sidewalks, heavy equipment sitting on street, construction materials in the street.
5/8/08 approved per Cathy H
4/15/09 - 1 YEAR WARRANTY - approved per Pam Klotz |
| |
General Comments: |
|