[Sun River Phase 30]
Number: Grading-39130

Drawing of Record Submitted 4/25/2008
Electronic Drawing 4/25/2008..5/8/2008
Final Grading Report 4/25/2008
Date Scheduled 4/29/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 4/30/2008 Corrections required per Kevin Condie.. 1. 2 spot with wire problems, 2. Check all valve on Angel Arch & in phase 30 3. Air Vac leaking. 4. valve at Sun River Parkway & Angel Arch need to be concrete in I've ask for 2 years has not been done. 5/7/2008 Approved per Kevin Condie 5/11/2009 Corrections required per Kevin Condie.. 1 year warranty.. Paint hydrants 6/9/2009 Approved per Kevin Condie.. 1 year warranty
Wastewater 4/30/2008 Corrections required per Kevin Condie.. 1. 2 spot with wire problems, 2. Check all valve on Angel Arch & in phase 30 3. Air Vac leaking. 4. valve at Sun River Parkway & Angel Arch need to be concrete in I've ask for 2 years has not been done. 5/7/2008 Approved per Kevin Condie 5/11/2009 Corrections required per Kevin Condie.. 1 year warranty.. Paint hydrants 6/9/2009 Approved per Kevin Condie.. 1 year warranty
Engineering 5/5/2008 Approved per Carlos Robles 5/6/2009 Approved per Carlos Robles 1 year warranty
City Development Engineer 4/29/08 corrections required per Cathy H . Electronic DWG of record - shift into HCN system (off some to the Southwest). Per Ken B - dirt piles across sidewalks, heavy equipment sitting on street, construction materials in the street. 5/8/08 (Elec Dwg of record okay)Per Cathy H. 5/8/08 approved per Cathy H 4/3/2009 Approved per Cahty H.. 1 year warranty..Note: Check public street-Angel Arch Drive
Landscaping 4/29/08 corrections required Per Ken B - dirt piles across sidewalks, heavy equipment sitting on street, construction materials in the street. 5/8/08 approved per Cathy H 4/15/09 - 1 YEAR WARRANTY - approved per Pam Klotz
    
General Comments: