[Fort Pierce-Bakston Frieght #51]
Number: Grading-39211

Drawing of Record Submitted 2/28/2008/
Electronic Drawing 2/28/2008
Final Grading Report 2/28/2008
Date Scheduled 3/3/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 3/5/2008 Corrections required per Carson Tait.. Need to cut direction of flow arrows and line size into the valve collars. Need to have the back flow assembly tested and tagged. Install a hose bib vacuum breaker on the outside hose bib. Locate wire test. 3/19/2008 Approved per Carson Tait 2/6/2009 Approved per Carson Tait.. 1 year warranty.. Wire good
Wastewater 3/5/2008 Corrections required per Carson Tait.. Need to cut direction of flow arrows and line size into the valve collars. Need to have the back flow assembly tested and tagged. Install a hose bib vacuum breaker on the outside hose bib. Locate wire test. 3/19/2008 Approved per Carson Tait 2/6/2009 Approved per Carson Tait.. 1 year warranty.. Wire good
Engineering 3/4/2008 Corrections required per Brandon Wright..Landscape boulders need to be 10' from back of curb, clean up piles of debris in back of lot, metal gates needed on trash enclosure. 3/20/2008 Approved per Brandon Wright.. Door on dumpster to be installed on Fri or Mon 2/6/09 - 1 year warranty - approved per Cathy H.
City Development Engineer 2/29/08 corrections required per Ken B. Sono-tube forms need to be removed at ext. lighting bases. Relocate landscape boulders out of 10' clear zone at public ROW in front. Trash enclosure requires solid metal doors and landscape incomplete with detention area needing finished. 3/18/08 corrections required per Ken B. Trash enclosure requires solid metal doors. 3/20/2008 Approved per Cathy H 2/9/09 - 1 year warranty - approved per Cathy H.
Landscaping 2/29/08 corrections required per Ken B. Sono-tube forms need to be removed at ext. lighting bases. Relocate landscape boulders out of 10' clear zone at public ROW in front. Trash enclosure requires solid metal doors and landscape incomplete with detention area needing finished. 3/18/08 corrections required per Ken B. Trash enclosure requires solid metal doors. 3/20/200/ Approved per Cathy H 2/9/2009 Corrections required per Doug W.. 1 year warranty.. Remove nersery stakes. Stake as needed with proper 2- stake method
    
General Comments: