Drawing of Record Submitted |
10/18/2007..revised 2/13/2008 |
Electronic Drawing |
10/18/2007..revised 2/13/2008 |
Final Grading Report |
10/18/2007 |
Date Scheduled |
10/22/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
10/27/2007 Approved per Carson Tait |
Wastewater |
10/27/2007 Approved per Carson Tait |
Engineering |
10/22/2007 Corrections required per Brandon Wright.. Drain structure not in
1/7/2008 Approved per Brandon Wright |
City Development Engineer |
10/24/07 corrections required per Cathy H. Electronic dwg of record needs to show monument locations and be placed in the city HCN system. Show pipe size, inverts, etc and S/W Drain on dwg (also detention area). Install S/W drain @ detention location. Complete project per plan.
1/4/08 corrections required per Ken B. Landscape boulders in 10' clear zone.
2/4/08 corrections required per Ken B. B. Boulders in 10' clear zone.
2/8/08 corrections required per Cathy H. Waiting for Electronic DWG of record.
2/14/2008 Corrections required per Jay Sandberg.. Boulders in 10' clear zone doors not on trash enclosure |
Landscaping |
10/24/07 approved per Cathy H. |
| |
General Comments: |
|