[Estates @ Hidden Valley Phase 3 & 4]
Number: Grading-39274

Drawing of Record Submitted 9/24/2008
Electronic Drawing 9/24/2008
Final Grading Report 9/24/2008
Date Scheduled 9/25/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 10/01/2008 Approved per Carson Tait.. Wire ok 10/16/2009 Approved per Darrin Judd.. 1 year warranty wire good
Wastewater 10/01/2008 Approved per Carson Tait.. Wire ok 10/16/2009 Approved per Darrin Judd.. 1 year warranty wire good
Engineering 9/30/2008 Corrections required per Carlos Robles.. Fix manhole failure 10/09/2008 Approved per Carlos Robles 9/1/2009 Corrections required per Brandon Wirht.. 1 year warranty.. Grind & seal cracks in curb line
City Development Engineer 9/29/08 corrections required per Cathy H. Electronic DWG of record - cannot open. Says file is invalid. 10/6/08 approved per Ken B. 9/1/2009 Corrections required per Ken Bricker.. 1 year warranty 1. Full depth curb & Gutter location #1 needs replaced. 2. End of roqad markier ismissing on Barcelona Drive. S/W missing end tapers on both Barcelona & Rome 4. Full depth curb & gutter crack at location #2
Landscaping 9/29/08 Approved per Ken B. 9/1/2009 Corrections required per Ken Bricker.. 1 year warranty 1. Full depth curb & Gutter location #1 needs replaced. 2. End of roqad markier ismissing on Barcelona Drive. S/W missing end tapers on both Barcelona & Rome 4. Full depth curb & gutter crack at location #2
    
General Comments: