Drawing of Record Submitted |
2/14/2008 |
Electronic Drawing |
2/14/2008 |
Final Grading Report |
12/17/2007 |
Date Scheduled |
2/14/2008 Per Dan McArthur |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
2/14/2008 Corrections required per Carson tait.. Need to have the back flow assembly tested and tagged.Need drawing of Records |
Wastewater |
2/14/2008 Corrections required per Carson tait.. Need to have the back flow assembly tested and tagged.Need drawing of Records |
Engineering |
|
City Development Engineer |
2/15/2008 Corrections required per Carlos Robles.. Fix soft spot dumpster needs to be enclosed. Need Drawing of records
2/18/2008 10% warranty bond for roadway improvemtns along 1490 East Circle |
Landscaping |
2/15/2008 Corrections required per Carlos Robles.. Fix soft spot dumpster needs to be enclosed. Need Drawing of records
2/18/2008 Encloser dumpster structure is missing |
| |
General Comments: |
|