| Drawing of Record Submitted | 2/14/2008 |
|---|---|
| Electronic Drawing | 2/14/2008 |
| Final Grading Report | 12/17/2007 |
| Date Scheduled | 2/14/2008 Per Dan McArthur |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 2/14/2008 Corrections required per Carson tait.. Need to have the back flow assembly tested and tagged.Need drawing of Records |
| Wastewater | 2/14/2008 Corrections required per Carson tait.. Need to have the back flow assembly tested and tagged.Need drawing of Records |
| Engineering | |
| City Development Engineer | 2/15/2008 Corrections required per Carlos Robles.. Fix soft spot dumpster needs to be enclosed. Need Drawing of records 2/18/2008 10% warranty bond for roadway improvemtns along 1490 East Circle |
| Landscaping | 2/15/2008 Corrections required per Carlos Robles.. Fix soft spot dumpster needs to be enclosed. Need Drawing of records 2/18/2008 Encloser dumpster structure is missing |
| General Comments: | |