Tuweap Drive Project
Number: Grading-38907

Drawing of Record Submitted 8/15/2007
Electronic Drawing 8/15/2007
Final Grading Report 8/15/2007
Date Scheduled 8/20/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 8/24/2007 Approved per Dennis Wright 7/2/08 - 1 year warranty - approved per Dennis Wright.
Water 8/20/07 corrections required per Kevin Condie. Someone stepped in valve collar, replace it. Need arrows and line size. Test backflow on irrigation system. Need concrete around hydrant and meter. May be city problem. 8/25/07 approved per Dustin Bracken. Above items have been finished. 8/30/2007 Approved per Kevin Condie 7/14/2008.. 1yr warranty..Wire good-TD
Wastewater 8/20/07 corrections required per Kevin Condie. Someone stepped in valve collar, replace it. Need arrows and line size. Test backflow on irrigation system. Need concrete around hydrant and meter. May be city problem. 8/25/07 approved per Dustin Bracken. Above items have been finished. 8/30/2007 Approved per Kevin Condie 7/14/2008.. 1yr warranty..Wire good-TD
Engineering 8/22/07 approved per Brandon W. 7/8/08 - 1 year warranty - corrections required per Brandon W. Road sinking around manhole.
City Development Engineer 8/17/2007 Approved per Ken Bricker 7/3/08 - 1 year warranty - approved per Ken B.
Landscaping 8/17/2007 Approved per Ken Bricker 7/3/08 - 1 year warranty - approved per Ken B.
    
General Comments: