[Miller Electric Building]
Number: Grading-39337

Drawing of Record Submitted 8/24/2007
Electronic Drawing 8/24/2007
Final Grading Report 8/28/2007
Date Scheduled 8/27/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 8/31/2007 Approved per Dennis Wright 8/5/2008 Approved per Dennis Wright
Water 8/27/2007 Corrections required per Darrin Judd.. Backflow needs to be tested and tagged on irrigations and fireline. Pour concrete and valve cans cut arrows and line pipe in concrete. 8/31/2007 Approved per Carson Tait 9/2/08 - 1 year warranty - approved per Kevin C.
Wastewater 8/27/2007 Corrections required per Darrin Judd.. Backflow needs to be tested and tagged on irrigations and fireline. Pour concrete and valve cans cut arrows and line pipe in concrete. 8/31/2007 Approved per Carson Tait 9/2/08 - 1 year warranty - approved per Kevin C.
Engineering 8/29/2007 Corrections required Per Carlos Robled.. not ready 9/5/07 approved per Carlos R. 8/12/2008 Approved per Carlos R.. 1 yr warranty
City Development Engineer 8/27/07 corrections required per Cathy H. Electronic DWG of record needs to include as-built pts. Along with as-built labels and tags (not per city spec, etc). Per Ken B - curbs need repaired, rock pile in parking lot, doors missing on trash dumpster, heavy equipment in parking lot. 8/31/07 corrections required per Ken B - solid metal doors are required on trash dumpster (screen doors have been installed and need replaced with solid). Wheel stops still being installed in parking lot. 9/10/07 approved per Ken B. 8/5/08 - 1 year warranty - Private improvements - N/A.
Landscaping 8/27/07 approved per Ken B. 8/5/08 - 1 year warranty - Private improvements - N/A.
    
General Comments: