| Drawing of Record Submitted | 3/25/2008 |
|---|---|
| Electronic Drawing | 3/25/2008 |
| Final Grading Report | 3/25/2008 |
| Date Scheduled | 3/27/2008 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 3/27/08 approved per Dennis Wright. 3/3/2009 Approved per Dennis Wright.. 1 year warranty |
| Water | 3/27/2008 Corrections required per Kevin Condie.. Check valve to see if they are open(cull), valve extension are needed on valves, arrows need to be bigger & line size bigger, concrete pad around fire hydrant, check wire,raise hydrant, cut off rebar in meter boxes 4/3/2008 Approved per Kevin Condie 4/12/2009 Approved per Kevin Condie.. 1 year warranty |
| Wastewater | 3/27/2008 Corrections required per Kevin Condie.. Check valve to see if they are open(cull), valve extension are needed on valves, arrows need to be bigger & line size bigger, concrete pad around fire hydrant, check wire,raise hydrant, cut off rebar in meter boxes 4/3/2008 Approved per Kevin Condie 4/12/2009 Approved per Kevin Condie.. 1 year warranty |
| Engineering | 3/27/08 approved per Brandon Wright. No enough compaction test provided inside parking lot for sewer and power. Owner is responsible for failing trenches. 3/4/2009 Approved per Brandon Wright.. 1 year warranty |
| City Development Engineer | 3/28/2008 Corrections required per Cathy H.. Elecrtonic Dwg of record needs to be placed in City HCN system 4/1/2008 Approved per Cathy H 3/4/2009 Approved per Cahty H.. 1 year warranty.. Private Improvements Only |
| Landscaping | 3/28/2008 Corrections required per Ken Bricker... Base of Flag pole needs R/R 4/2/08 corrections required per Ken B. ADA ramp at the front needs both handrails secured in sidewalk/inclined ramp. 4/03/2008 Approved per Ken Bricker 3/4/2009 Approved per Doug W.. 1 year warranty |
| General Comments: | |