| Drawing of Record Submitted | 2/7/2008 |
|---|---|
| Electronic Drawing | 2/7/2008 |
| Final Grading Report | 2/7/2008 |
| Date Scheduled | 2/11/2008 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 2/11/2008 Approved per Dennis Wright 1/2/2009 Approved per Dennis Wright..1 year warranty |
| Water | 2/11/2008 Approved per Kevin Condie 1/9/09 - 1 year warranty - approved per Carson T. |
| Wastewater | 2/11/2008 Approved per Kevin Condie 1/9/09 - 1 year warranty - approved per Carson T. |
| Engineering | 2/13/2008 Approved per Carlos Robles 1/6/2009 Approved per Carlos Robles.. 1 year warranty |
| City Development Engineer | 2/11/2008 Corrections required per Ken Bricker.. ADA signs are missing access is still blocked on Post Office side. Electronic Drawing or records, not on City HCN network. 2/19/2008 Approved per Carlos RObles 1/6/09 - 1 year warranty - Private improvements only - Approved per Cathy H. |
| Landscaping | 2/11/2008 Corrections required per Ken Bricker.. ADA signs are missing access is still blocked on Post Office side. 2/19/2008 Approved per Carlos Robles 1/15/2009 Corrections required per Laura Taylor.. 1 year warreanty.. Replace dead Palm tree next to Riverside Drive |
| General Comments: | |