[Meadow Valley Farms Master Roads Phase 1]
Number: Grading-39599

Drawing of Record Submitted 2/11/2009 Revised 3/6/2009
Electronic Drawing 2/11/2009 Revised 3/6/2009
Final Grading Report 2/11/2009
Date Scheduled 2/12/2009
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 2/19/2009 Corrections required per Kevin Condie.. 2/13/09 wire good 1. Need concrete around hydrants 2/25/2009 Approved per Lee Kell..Meadow Valley offsite sewer pass, Drawing of Records still wrong Crimson Ridge to Road A pass Drawing of Records received Silkwood Pass Final. Drawing of of Records 3/12/2009 Approved per Carson Tait
Wastewater 2/19/2009 Corrections required per Kevin Condie.. 2/13/09 wire good 1. Need concrete around hydrants 2/25/2009 Approved per Lee Kell..Meadow Valley offsite sewer pass, Drawing of Records still wrong Crimson Ridge to Road A pass Drawing of Records received Silkwood Pass Final. Drawing of of Records 3/12/2009 Approved per Carson Tait
Engineering 3/12/2009 Corrections required per Carlos Rolbes..Landscaping incomplete, missing signs, monuments not stamped finish storm drain 4/6/2009 Approved per Carlos Robles 2/9/10 - 1 year warranty - corrections required per Brandon W. Road settling over sewer trench.
City Development Engineer 2/12/2009..Corrections required per Cahty H..1. Requires end of road markers at end of Crimson Road(3500 so)2. 10% warranty bond. 3. Electronic Dwg of record needs to be separate from Church Roads & Silkwood Phs.(see attached sheet)3. Electronic Dwg of record need to show all storm drain lines labeled(missing two going from MH to the North). Needs to show storm drain extension to the West eventually making it to ft. Pierce wash. temp detention facility needs to be shown & labeled on as-built. 2/25/09 corrections required per Cathy H. Electronic DWG of record - missing roadway improvements from Little Valley Road to the East in the DWG. Clarify what portion of storm drain is built from Little Valley Road to the West. Crimson Ridge Drive needs to have its own DWG of record (electronic). Detention facilities still need to be shown and labeled on as-built. See previous list. 3/2/2009 Correctionsrequired per Cahty H.. 1. Landscaping is incomp. 2. 10% warranty bond, 3.Provide Crimson Ridge paper Dwg of record, 4. Electronic Dwg of record revisions-see attached sheet 3/12/09 corrections required per Cathy H. 10% warranty bond. Landscaping incomplete. Place 3 more "Keep Right" signs in islands along Crimson Ridge. Place cover on Storm Drain manhole at West end in Equestrian Drive. 4/2/09 approved per Cathy H - Electronic DWG of Record OK and Bond okay. 2/3/10 - 1 year warranty - check road and L/S between Silkwood Phase 1 & Church - Crimson Ridge Drive - approved per Ken B.
Landscaping 2/20/2009 Corrections required per Laura Taylor.. landscaping not started. 3/3/2009 Corrections required per Laura Taylor.. Medians & common area not yet landscape 4/6/2009 Approved per Laura Taylor 2/3/10 - 1 year warranty - check road and L/S between Silkwood Phase 1 & Church - Crimson Ridge Drive - approved per Ken B.
    
General Comments: