Drawing of Record Submitted |
1/14/2009 |
Electronic Drawing |
1/14/2009 |
Final Grading Report |
1/13/2009 |
Date Scheduled |
1/15/2009 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
1/15/2009 Approved per Dennis Wright |
Water |
1/20/2009 Corrections required per Kevin Condie..Not ready contractors need to show H209 rep-all meter boxes need collar w/rebar, check all meter for H20,check all valve are turned on m flush fire hydrants, check locate wire by City, clean & paint hydrants
1/028/2009 Approved per Kevin Condie |
Wastewater |
1/20/2009 Corrections required per Kevin Condie..Not ready contractors need to show H209 rep-all meter boxes need collar w/rebar, check all meter for H20,check all valve are turned on m flush fire hydrants, check locate wire by City, clean & paint hydrants
1/028/2009 Approved per Kevin Condie |
Engineering |
1/15/09 corrections required per Brandon W. Failed compaction test in final grading report (on file in City office). Cross gutter on Snow Canyon Parkway not inspected. Street signs not installed. Monument, collars are not in or stamped. All DI boxes need to be cleaned out. End of road markers needed where asphalt ends. Lots on upper end to be cleaned off and graded. Trash and debris removed. Property corners need to be set - front and rear. Clean outs broken on upper wall for water capture trench. Remove rock off pads. Rock wall compliance letter REQUIRED. Remove dirt ramps off of curb. Landscape not complete. Cleanup roads. Missing collars on meters. NOT A COMPLETE LIST.
2/6/2009 Corrections required per Brandon Wright..Note: Handicap ramp were placed to drawing on plans approved by City, they don not meet ADA spec. Agec provided a letter concerning low compaction test a 2 year warranty is need for all tests covered in this letter.. *Stop signs are not installed * bond for address signs.
39680
Approved per Brandon Wright |
City Development Engineer |
1/16/2009 Corrections required per Cathy H..10% warranty bond, private improvement development certification letters, electronic dwg of records needs to show all rock & retaining walls w/elevations, complete walls between lots Dr slope at a 2:/slope
2/10/2009 Corrections required Cathy H.. 1. 10% warranty Bond, 2. Electronic Dwg of Record needs to show all rock wall & conc. wall on Dwg & elevations
3/2/09 corrections required per Cathy H. No data on CD for electronic DWG. 10% warranty bond.
10/28/2010 Approved per Wes Jenkins |
Landscaping |
1/14/2009 Corrections required Laura Taylor..Landscaping incomplete.
2/5/2009..Corrections required per
Per Zac Koceja..Landscape area along Snow Canyon parkway 95% complete,Split Rock waiting for a few Roses. Three willows located in traffic line of sight corridor need to be moved to other landscape areas. Common area landscape adjacent to streets "H" "I","J" "K" and "L" are currently not landscape. Recommend temporary approval be given on landscape for thirty days or an agreement is made between development services and split Rock development on the timing of common area landscape which ever, occurs first.
10/28/2010 Approved per Wes Jenkins |
| |
General Comments: |
|