| Drawing of Record Submitted | 11/06/2007 |
|---|---|
| Electronic Drawing | 11/06/2007 |
| Final Grading Report | 11/10/2007 |
| Date Scheduled | 11/12/2007 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 12/13/2007 Corrections required per Wayne M.. Meter box needs a new lid,the break a way on the fire hyd is below the concrete and the in line valve needs to be found and paint the Fire Hyd. |
| Wastewater | 12/13/2007 Corrections required per Wayne M.. Meter box needs a new lid,the break a way on the fire hyd is below the concrete and the in line valve needs to be found and paint the Fire Hyd. |
| Engineering | 12/13/2007 Approved per Carlos Robles |
| City Development Engineer | 12/12/07 corrections required per Cathy H. Electronic DWG of record needs to be put into the city HCN system. Also all storm drain MH and inlet information needs to be provided. |
| Landscaping | 12/12/07 approved per Cathy H. |
| General Comments: | |