Drawing of Record Submitted |
11/07/08..revised 11/18/08 |
Electronic Drawing |
11/07/08..revised 11/18/08 |
Final Grading Report |
11/13/2008 |
Date Scheduled |
11/10/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
11/12/2008 Approved per Dennis Wright
10/29/2009 Approved per Dennis Wright. 1 year warranty |
Water |
11/14/2008 Corrections required per Kevin Condie.. 1. Raise Fire Hydrant, 2. Meter need to be marked to what units they go to. 3. Valve collars Don't meet spec. need to be 12" from side of can to asphalt.4. Need arrow and line sizes in collars, 5. Need concrete collar around Hydrants. 6. Meter may need to be rasied. 7. Check wires.
12/01/2008 Corrections required per Kevin Condie.. Finish Punch List
12/17/08 approved per Kevin C.
11/24/2009 Approved per Wayne M.. 1 year warranty.. checked wire it was good |
Wastewater |
11/14/2008 Corrections required per Kevin Condie.. 1. Raise Fire Hydrant, 2. Meter need to be marked to what units they go to. 3. Valve collars Don't meet spec. need to be 12" from side of can to asphalt.4. Need arrow and line sizes in collars, 5. Need concrete collar around Hydrants. 6. Meter may need to be rasied. 7. Check wires.
12/01/2008 Corrections required per Kevin Condie.. Finish Punch List
12/17/08 approved per Kevin C.
11/24/2009 Approved per Wayne M.. 1 year warranty.. checked wire it was good |
Engineering |
11/10/2008 Corrections requiredd per Brandon Wright..NOT a complete list..Side walk drainage structure need to be completed grate & lid. @ sidewalk panels cracked on Snow Canyon parkway replace. Missing side walk send 1400 W by detention pond.Landscaping not complete. Move Boulder out of right way 1400 W & Snow Canyon Parkway. Clean up construction material in right of way(easement) clean of walk. Clean out need to be covered missing collars hyds.
12/12/2008 Approved per Brandon Wright
11/2/09 - 1 year warranty - approved per Brandon W. |
City Development Engineer |
11/10/08 corrections required per Cathy H. Electronic DWG of record - remove language such as "connect to", "provide," "proposed," etc. This is an as-built DWG. per Ken B. Landscape is incomplete. Drainage structure is incomplete. Fire hydrants are missing pads. Water ponding in parking lot. Front signage incomplete.
11/19/08 corrections required per Ken b. Fire hydrant's are missing pads (3), drainage box is not buried, landscape is not complete and front business sign is incomplete.
12/1/08 corrections required per Ken B. Fire hydrant is sitting too low. Drainage box is sitting too high. Business sign and landscape is incomplete.
12/10/08 corrections required per Ken B. Landscape is incomplete. Front fire hydrant is out-of-service. Concrete collars are being installed.
12/15/2008 Approved per Ken Bricker
11/2/09 - 1 year warranty - approved per Cathy H. |
Landscaping |
11/14/2008 Corrections required per Larry..Drip tubing laying on top of the ground, dead pine tree, other pine alling over, back flow not covered with box rock mulch missing in some planters, dead shrubs (Heavenly Bambo-Nandina domestica) some ares do not finished.
12/01/2008 Corrections required per Laura Taylor.. Need to complete prior comments on 11-14-08
12/12/2008 Approved per Larry Shane.. Showed some trees that need stakes removed to Contractor on site
11/2/09 - 1 year warranty - approved per Ken B. |
| |
General Comments: |
|