[Pelican Hills Phase 1-B]
Number: Grading-36879

Drawing of Record Submitted 11/20/2007..revised 12/03/07
Electronic Drawing 11/20/2007..revised 12/03/07..revised 12/11/07
Final Grading Report 11/26/2007
Date Scheduled 11/28/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 12/17/2007 Approved per Dennis Wright 11/04/2008 Approved per Dennis Wright 1 yr warranty
Water 11/28/2007 Corrections required per Tim Dotson.. Valves in fornt #27,#28 need arrows and sizes marked in collars.Valves in front of #26 meter too need concrete around them hydrant also. Locate meter by Tennis courts shown on plan. 12/06/2007 Approved per Darrin Judd.. Checked concrete around valve collars. Check for line size and arrows marked in conctete. Meter at tennis court has been removed from plans. 11/26/08 - 1 year warranty (PHASE 1B) - approved per Darrin Judd - Wire good.
Wastewater 11/28/2007 Corrections required per Tim Dotson.. Valves in fornt #27,#28 need arrows and sizes marked in collars.Valves in front of #26 meter too need concrete around them hydrant also. Locate meter by Tennis courts shown on plan. 12/06/2007 Approved per Darrin Judd.. Checked concrete around valve collars. Check for line size and arrows marked in conctete. Meter at tennis court has been removed from plans. 11/26/08 - 1 year warranty (PHASE 1B) - approved per Darrin Judd - Wire good.
Engineering 11/28/2007 Corrections required per Brandon Wright.. Tim expansion joints, fix broken walk Bldg #12 two spots,cut plastic off of truncated domes,clean all DI boxes in side, finish side walk in phase 12/05/2007 Corrections required per Brandon Wright.. List not complete. 12/12/2007 Approved per Brandon Wright 11/05/2008 Approved per Brandon Wright.. 1 yr warranty 1/9/09 - 1 year warranty - Phase 1A - Corrections required per Brandon W. Remove and replace asphalt on new Canyon View Drive next to storm drain box (settling). Remove and replace walk on Canyon View Drive water leaking from sprinkler box (5 sections). 1/20/2009 Corrections required per Brandon Wright.. 1 year warranty:Crack seal Canyon View & rework, drainage on South shoulder 2/24/2009 Approved per Brandon Wright.. 1 year warranty
City Development Engineer 11/28/2007 Corrections required per Cathy H..Electronic dwg of record needs to show drain pipe size type and slope. Also dwg needs to be placed in City HCN system. 12/04/07 Corrections required per Cathy H.. Electronic Dwg of record is off to the South of City HCN. Revise. 12/12/07 approved per Cathy H. 11/4/08 - 1 year warranty Phase 1 B. - approved per Ken B.
Landscaping 11/28/2007 Corrections required per Ken Bricker.. Landscape missing between garage units landscape missing on most of phase 1-B 11/29/07 approved per Cathy - bond in place. 11/06/2008 Approved per Laura Taylor 1yr warranty 1/20/2009 Approved per Shane More 1 year warranty(Phase A-1)
    
General Comments: