[Fort Pierce(Coughlin Company)#74]
Number: Grading-38528

Drawing of Record Submitted 11/30/2007..revised 2/13/2008..8/6/08
Electronic Drawing 11/30/2007..revised 2/13/2008..8/6/08
Final Grading Report 11/30/2007
Date Scheduled 12/08/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 2/13/2008 Corrections required per Carson Tait..Need to install a meter re-setter to raise up the meter to within spec. Need to turn the Fire hydrant so that the seamer nozzle faces the street. 5/16/08 corrections required per Carson Tait. Checked M-F. They have turned the hydrant, but still need to install a meter re-setter. 8/11/2008 Corrections required per Cartson Tait.. need to install a one inch meter re-setter to bring the meter up to spec 10/24/2008 Corrections required per Carson Tait..NO change since the last 3 re-inspects. Need to install a meter re-setter or multiple resetters to bring the meter up to within 12" of the top of the upper box. 4/9/2009 Approved per Carson Tait
Wastewater 2/13/2008 Corrections required per Carson Tait..Need to install a meter re-setter to raise up the meter to within spec. Need to turn the Fire hydrant so that the seamer nozzle faces the street. 5/16/08 corrections required per Carson Tait. Checked M-F. They have turned the hydrant, but still need to install a meter re-setter. 8/11/2008 Corrections required per Cartson Tait.. need to install a one inch meter re-setter to bring the meter up to spec 10/24/2008 Corrections required per Carson Tait..NO change since the last 3 re-inspects. Need to install a meter re-setter or multiple resetters to bring the meter up to within 12" of the top of the upper box. 4/9/2009 Approved per Carson Tait
Engineering 12/05/2007 Corrections required per Brandon Wright..Finish drive approach, finish yard behind shop,road not completed. 2/06/2008 Approved per Brandon Wright 2/8/10 - 1 year warranty - Corrections REQUIRED per Brandon W. Seal road to East of building. Talked with AJ Construction.
City Development Engineer 12/05/2007 Corrections required per Cathy H..Electronic Dwg of record- is the sewer line installed in the North Road(if so revise notes to read "Connected" etc.) drawing needs to be place in the City HCN System. 2/4/08 corrections required per Ken B. Boulders in 10' clear zone. Access (2) are incomplete. 2/8/08 corrections required per Cathy H. Waiting for Electronic DWG of record. 2/14/2008 Corrections required per Jay Sandberg.. Trash enclosure not built 5/12/2008 Approved Per Ken Bricker 2/3/10 - 1 year warranty - check L/S & 1630 Road Improvements - Approved per Ken B.
Landscaping 12/05/2007..Corrections Per Ken Bricker.. Need to finish landscape at SW corner(B-4 company sign) and street not installed access is still under construction. 2/4/08 corrections required per Ken B. Boulders in 10' clear zone. Access (2) are incomplete. 2/8/08 approved per Ken B. 2/3/10 - 1 year warranty - check L/S & 1630 Road Improvements - Approved per Ken B.
    
General Comments: