Drawing of Record Submitted |
11/30/2007..revised 2/13/2008..8/6/08 |
Electronic Drawing |
11/30/2007..revised 2/13/2008..8/6/08 |
Final Grading Report |
11/30/2007 |
Date Scheduled |
12/08/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
2/13/2008 Corrections required per Carson Tait..Need to install a meter re-setter to raise up the meter to within spec. Need to turn the Fire hydrant so that the seamer nozzle faces the street.
5/16/08 corrections required per Carson Tait. Checked M-F. They have turned the hydrant, but still need to install a meter re-setter.
8/11/2008 Corrections required per Cartson Tait.. need to install a one inch meter re-setter to bring the meter up to spec
10/24/2008 Corrections required per Carson Tait..NO change since the last 3 re-inspects. Need to install a meter re-setter or multiple resetters to bring the meter up to within 12" of the top of the upper box.
4/9/2009 Approved per Carson Tait |
Wastewater |
2/13/2008 Corrections required per Carson Tait..Need to install a meter re-setter to raise up the meter to within spec. Need to turn the Fire hydrant so that the seamer nozzle faces the street.
5/16/08 corrections required per Carson Tait. Checked M-F. They have turned the hydrant, but still need to install a meter re-setter.
8/11/2008 Corrections required per Cartson Tait.. need to install a one inch meter re-setter to bring the meter up to spec
10/24/2008 Corrections required per Carson Tait..NO change since the last 3 re-inspects. Need to install a meter re-setter or multiple resetters to bring the meter up to within 12" of the top of the upper box.
4/9/2009 Approved per Carson Tait |
Engineering |
12/05/2007 Corrections required per Brandon Wright..Finish drive approach, finish yard behind shop,road not completed.
2/06/2008 Approved per Brandon Wright
2/8/10 - 1 year warranty - Corrections REQUIRED per Brandon W. Seal road to East of building. Talked with AJ Construction. |
City Development Engineer |
12/05/2007 Corrections required per Cathy H..Electronic Dwg of record- is the sewer line installed in the North Road(if so revise notes to read "Connected" etc.) drawing needs to be place in the City HCN System.
2/4/08 corrections required per Ken B. Boulders in 10' clear zone. Access (2) are incomplete.
2/8/08 corrections required per Cathy H. Waiting for Electronic DWG of record.
2/14/2008 Corrections required per Jay Sandberg.. Trash enclosure not built
5/12/2008 Approved Per Ken Bricker
2/3/10 - 1 year warranty - check L/S & 1630 Road Improvements - Approved per Ken B. |
Landscaping |
12/05/2007..Corrections Per Ken Bricker.. Need to finish landscape at SW corner(B-4 company sign) and street not installed access is still under construction.
2/4/08 corrections required per Ken B. Boulders in 10' clear zone. Access (2) are incomplete.
2/8/08 approved per Ken B.
2/3/10 - 1 year warranty - check L/S & 1630 Road Improvements - Approved per Ken B. |
| |
General Comments: |
|