Drawing of Record Submitted |
6/6/2008..revised 6/23/08 |
Electronic Drawing |
6/6/2008..revised 6/23/08 |
Final Grading Report |
6/17/2008 |
Date Scheduled |
6/19/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
6/23/2008 Corrections required Per Darrin Judd..Tracer wire for Fire line does not work. Meter is too deep it should be 12" below top of box. Fire riser in building needs to be tested back flow.
6/25/2008 Approved per Darrin Judd
5/6/2009 Approved per Carson Tait.. 1 year warranty |
Wastewater |
6/23/2008 Corrections required Per Darrin Judd..Tracer wire for Fire line does not work. Meter is too deep it should be 12" below top of box. Fire riser in building needs to be tested back flow.
6/25/2008 Approved per Darrin Judd
5/6/2009 Approved per Carson Tait.. 1 year warranty |
Engineering |
6/25/2008 Approved per Carlos Robles
5/6/2009 Approved per Carlos Robles 1 year warranty |
City Development Engineer |
6/18/2008 Corrections required per Cathy H.. Electronic Dwg of record is missing storm drain info & pipe tie ins from bocx to box (inv. etc).
6/24/08 corrections required per Ken B. Stop sign has not been installed at access.
6/26/08 approved per Ken B.
5/6/09 - 1 year warranty - Not applicable - No public improvements - per Cathy H. |
Landscaping |
6/18/2008 Corrections required per Ken Bricker..Still installing landscaping, large mobile dumpster & port a pot still on site, signage is in/comp. Rock piles in parking area striping is missing.
6/24/08 approved per Cathy H.
6/11/2009 Approved Per Laura Taylor.. 1 year warranty |
| |
General Comments: |
|