[Fort Pierce/Swiss Bank Storage #40]
Number: Grading-40001

Drawing of Record Submitted 8/5/2008
Electronic Drawing 8/5/2008
Final Grading Report 7/25/2008
Date Scheduled 8/7/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 8/12/2008 Corrections required per Carson tait.. Need to complete asphalt bring valve cans up to grade and pour collars and pads with arrows and lines sizes 10/24/2008 Corrections required per Carson Tait.. Cut the rebar out of the way on the North meter box. It is out of spec. Test B/F fire riser (back flow) 11/04/2008 Approved per Carson Tait 10/19/2009 Approved per Tim Dotson.. 1 year warranty.. Wire is good and all looks to be ok inside & out
Wastewater 8/12/2008 Corrections required per Carson tait.. Need to complete asphalt bring valve cans up to grade and pour collars and pads with arrows and lines sizes 10/24/2008 Corrections required per Carson Tait.. Cut the rebar out of the way on the North meter box. It is out of spec. Test B/F fire riser (back flow) 11/04/2008 Approved per Carson Tait 10/19/2009 Approved per Tim Dotson.. 1 year warranty.. Wire is good and all looks to be ok inside & out
Engineering 8/7/2008 Corrections required per Brandon Wright.. Driveways not complete, landscaping not complete 11/03/2008 Approved per Brandon Wright 10/2/09 - 1 year warranty - approved per Brandon W.
City Development Engineer 8/7/08 corrections required per Ken B. Still under construction. 10/23/08 approved per Ken B. 10/2/09 - 1 year warranty - approved per Ken B.
Landscaping 8/7/08 corrections required per Ken B. Still under construction. 10/23/2008 approved per Ken Bricker 10/2/09 - 1 year warranty - approved per Ken B.
    
General Comments: