| Drawing of Record Submitted | 8/5/2008 |
|---|---|
| Electronic Drawing | 8/5/2008 |
| Final Grading Report | 7/25/2008 |
| Date Scheduled | 8/7/2008 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 8/12/2008 Corrections required per Carson tait.. Need to complete asphalt bring valve cans up to grade and pour collars and pads with arrows and lines sizes 10/24/2008 Corrections required per Carson Tait.. Cut the rebar out of the way on the North meter box. It is out of spec. Test B/F fire riser (back flow) 11/04/2008 Approved per Carson Tait 10/19/2009 Approved per Tim Dotson.. 1 year warranty.. Wire is good and all looks to be ok inside & out |
| Wastewater | 8/12/2008 Corrections required per Carson tait.. Need to complete asphalt bring valve cans up to grade and pour collars and pads with arrows and lines sizes 10/24/2008 Corrections required per Carson Tait.. Cut the rebar out of the way on the North meter box. It is out of spec. Test B/F fire riser (back flow) 11/04/2008 Approved per Carson Tait 10/19/2009 Approved per Tim Dotson.. 1 year warranty.. Wire is good and all looks to be ok inside & out |
| Engineering | 8/7/2008 Corrections required per Brandon Wright.. Driveways not complete, landscaping not complete 11/03/2008 Approved per Brandon Wright 10/2/09 - 1 year warranty - approved per Brandon W. |
| City Development Engineer | 8/7/08 corrections required per Ken B. Still under construction. 10/23/08 approved per Ken B. 10/2/09 - 1 year warranty - approved per Ken B. |
| Landscaping | 8/7/08 corrections required per Ken B. Still under construction. 10/23/2008 approved per Ken Bricker 10/2/09 - 1 year warranty - approved per Ken B. |
| General Comments: | |