[Boulder Springs Villas Phase III]
Number: Grading-32062

Drawing of Record Submitted 2/15/2008
Electronic Drawing 2/15/2008
Final Grading Report 2/19/2008
Date Scheduled 2/20/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 2/25/2008 Corrections required per Carson Tait.. Need to replace the valve collar on the West Side (3 valves).Is the hydrant on the West Side temporary or permanent? Locate wire does not trace through. The City spec calls for #4 bar in the meter boxes. 12/02/2013 Approved per Kevin Condie
Wastewater 2/25/2008 Corrections required per Carson Tait.. Need to replace the valve collar on the West Side (3 valves).Is the hydrant on the West Side temporary or permanent? Locate wire does not trace through. The City spec calls for #4 bar in the meter boxes. 12/02/2013 Approved per Kevin Condie
Engineering 2/20/2008 Approved per Carlos Robles
City Development Engineer 2/20/2008 Corrections required per Cathy H.. Electronic Dwg of record-temp. retention basin needs to be removed, storm drain pipe needs to be labled with type,size,slope, length etc., and drainage system needs to show how it is connected from cul-de-sac to rest of the system. 12/31/2013.. Approved per Wes Jenkins
Landscaping 2/20/2008 Approved per Ken Bricker..
    
General Comments: