Washington Fields LDS 8th Ward
Number: Grading-39111

Drawing of Record Submitted 4/10/2008
Electronic Drawing 4/10/2008..revised 4/24/08
Final Grading Report 4/10/2008
Date Scheduled 4/15/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 4/18/08 approved per Carson Tait. 6/15/2009 Approved perCarson Tait.. 1 year warranty
Wastewater 4/18/08 approved per Carson Tait. 6/15/2009 Approved perCarson Tait.. 1 year warranty
Engineering 4/16/08 Approved per Carlos Robles 4/13/2009 Approved per Carlos Robles.. 1 year warranty
City Development Engineer 4/15/08 corrections required per Cathy H. Electronic DWG of record needs to be in one DWG. It also needs to show all drainage improvements for site. per Ken B. End of entrance is incomplete. Landscaping is incomplete. Stop signs are missing. Rock piles in parking lot, green sidewalks, detention area incomplete and ADA signage is incomplete. 4/25/08 corrections required per Cathy H. Electronic DWG of record needs to show all drainage improvements as per approved plans. 5/2/2008 Approved per Ken Bricker 4/2/09 - 1 year warranty (check only 3000 E St Improvements - Approved per Ken B.
Landscaping 4/15/08 corrections required per Ken B. End of entrance is incomplete. Landscaping is incomplete. Stop signs are missing. Rock piles in parking lot, green sidewalks, detention area incomplete and ADA signage is incomplete. 4/25/08 corrections required per Ken B - Port-a-pot still on site, heavy equipment on site, landscape incomplete at front, detention incomplete. 5/2/2008 Approved per Ken Bricker.. Remove Port A Pot off site 4/14/09 1 year warranty - corrections required per Laura Taylor - Tree Stakes should be removed.
    
General Comments: