[Fort Peirce/Robinson Refrig #89]
Number: Grading-40126

Drawing of Record Submitted 11/07/2008..12/3/08 revised /WW
Electronic Drawing 11/07/2008
Final Grading Report 11/12/2008
Date Scheduled 11/17/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 11/17/2008 Approved per Carson Tait
Wastewater 11/17/2008 Approved per Carson Tait
Engineering 11/17/2008 Corrections required per Brandon Wright..Wall certification needed from GTS side and back, patch parking lot. 11/18/2008 Approved per Brandon Wright 10/30/2009 Corrections required per Brandon Wright.. 1 year warranty.,. Broken concrete on ADA ramp
City Development Engineer 11/18/08 corrections required per Cathy H. Provide storm drain inlet information (rim, inv. elevations, etc.) for onsite as well as curb inlet on the electronic DWG of Record. per Ken B. Access gate closed (could not inspect back area). Stop sign is missing. Front access is sloped for too much +20% (plans shows 8%). 11/21/08 corrections required per Ken B. No change from 11/18/08 corrections. 12/1/08 approved per Cathy H . Access to be corrected for proper slope for safe access of trucks. 11/6/09 - 1 year warranty - Approved per Cathy H.
Landscaping 11/20/2008 Approved per Larry Shane 11/6/09 - 1 year warranty - Check Landscaping - Approved per Cathy H.
    
General Comments: