Drawing of Record Submitted |
8/20/2008 |
Electronic Drawing |
8/20/2008 |
Final Grading Report |
8/20/2008 |
Date Scheduled |
8/25/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
8/26/2008 Approvedper Carson Tait.. Need 2 two foot valve key extensions on the hydrant and fire line valves.
9/14/2009 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
8/26/2008 Approvedper Carson Tait.. Need 2 two foot valve key extensions on the hydrant and fire line valves.
9/14/2009 Approved per Kevin Condie.. 1 year warranty |
Engineering |
8/26/2008 Approved required per Brandon Wright.. Note: Contractor to seal damages on Road & Trail
8/19/09 - 1 year warranty - corrections required per Brandon W. Stop signs need to put back up. Dumpster needs to be on west side of building. |
City Development Engineer |
8/25/08 corrections required per Cathy H. Electronic DWG of record - provide pipe lengths, sizes and types for storm drain. per Ken B. Missing ramp access at driveways, landscape is incomplete. Missing stop signs at exits. Missing end of road markers at Quality Dr. Missing trash enclosure.
9/10/08 approved per Cathy H. End of road markers for Quality Drive are missing. To be installed by Quality Excavation.
8/20/09 - 1 year warranty - approved per Ken B. |
Landscaping |
8/25/08 corrections required per Ken B. Missing ramp access at driveways, landscape is incomplete. Missing stop signs at exits. Missing end of road markers at Quality Dr. Missing trash enclosure.
9/10/08 corrections required per Ken B. Landscape is incomplete.
9/16/08 approved per Ken B.
8/20/09 - 1 year warranty - approved per Ken B. |
| |
General Comments: |
|