[Fort Pierce/Staheli Laundry #153]
Number: Grading-40151

Drawing of Record Submitted 8/20/2008
Electronic Drawing 8/20/2008
Final Grading Report 8/20/2008
Date Scheduled 8/25/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 8/26/2008 Approvedper Carson Tait.. Need 2 two foot valve key extensions on the hydrant and fire line valves. 9/14/2009 Approved per Kevin Condie.. 1 year warranty
Wastewater 8/26/2008 Approvedper Carson Tait.. Need 2 two foot valve key extensions on the hydrant and fire line valves. 9/14/2009 Approved per Kevin Condie.. 1 year warranty
Engineering 8/26/2008 Approved required per Brandon Wright.. Note: Contractor to seal damages on Road & Trail 8/19/09 - 1 year warranty - corrections required per Brandon W. Stop signs need to put back up. Dumpster needs to be on west side of building.
City Development Engineer 8/25/08 corrections required per Cathy H. Electronic DWG of record - provide pipe lengths, sizes and types for storm drain. per Ken B. Missing ramp access at driveways, landscape is incomplete. Missing stop signs at exits. Missing end of road markers at Quality Dr. Missing trash enclosure. 9/10/08 approved per Cathy H. End of road markers for Quality Drive are missing. To be installed by Quality Excavation. 8/20/09 - 1 year warranty - approved per Ken B.
Landscaping 8/25/08 corrections required per Ken B. Missing ramp access at driveways, landscape is incomplete. Missing stop signs at exits. Missing end of road markers at Quality Dr. Missing trash enclosure. 9/10/08 corrections required per Ken B. Landscape is incomplete. 9/16/08 approved per Ken B. 8/20/09 - 1 year warranty - approved per Ken B.
    