[Beehive Homes Cottages Phase III]
Number: Grading-39995

Drawing of Record Submitted 9/24/2008..revised 10/14/08
Electronic Drawing 9/25/2008..revised 10/14/08
Final Grading Report 9/25/2008
Date Scheduled 9/29/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 9/30/2008 Approved per Dennis Wright 9/1/2009 Approved per Dennis Wright.. 1 year warranty
Water 10/03/2008 Corrections required per Per Darren Judd.. Back flow assemblies on fire risers and landscaping were to be tested and tagged,All valves need to be raised and collard valve in planter at end of Cul da sac needs to be raised. Meter boxes need to be cleaned out. Hydrant in middle of project needs to be poured. Contractor needs to shows that trace wire works. 10/27/2008 Approved per Darrin 10/16/2009 Approved per Darrin Judd.. 1 year warranty.. wire good
Wastewater 10/03/2008 Corrections required per Per Darren Judd.. Back flow assemblies on fire risers and landscaping were to be tested and tagged,All valves need to be raised and collard valve in planter at end of Cul da sac needs to be raised. Meter boxes need to be cleaned out. Hydrant in middle of project needs to be poured. Contractor needs to shows that trace wire works. 10/27/2008 Approved per Darrin 10/16/2009 Approved per Darrin Judd.. 1 year warranty.. wire good
Engineering 9/29/2008 Corrections required per Brandon Wright..Site is not landscaped, cannot find drain in sidewalk on plan remove,dumpster enclosure is not complete, need to remove all dumpsters and porta potty on site. Broken walk on Tonaquint Dr & gutter, drain under wall on Tonaquint Dr needs to be removed. Cannot drain out or City walk, landscape & rip rap detention pond. 10/28/2008 Approved per Brandon Wright 9/2/09 - 1 year warranty - approved per Brandon W.
City Development Engineer 9/29/08 corrections required per Cathy H. Electronic DWG of record - grading and utilities need to be all in one DWG (combine). Show sewer lateral ties from TBC to CO and bldg to CO. Is the sewer connected to city system (states by city - is it done?) Show detention facilities as constructed. What is purpose of curb opening on DWG? It is at the high point. 10/16/2008 Approved per Cathy Hasfurther 8/31/2009 Approved per Cathy H.. 1 year warranty Private improvements only
Landscaping 9/29/08 corrections required per Ken B. Still under construction with landscape incomplete. 10/16/2008 Corrections required per Ken Bricker.. Landscaping incomplete in front of units 10/27/2008 Approved per Ken Bricker 8/31/2009 Approved per Cathy H.. 1 year warranty Private improvements only
    
General Comments: