| Drawing of Record Submitted | 1/13/2009 |
|---|---|
| Electronic Drawing | 8/12/2009 |
| Final Grading Report | 1/2/2009 |
| Date Scheduled | 1/26/2010 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 1/25/2010 Approved per Dennis Wright |
| Water | 1/27/2010 Approved per Kevin Condie no change in H20 |
| Wastewater | 1/27/2010 Approved per Kevin Condie no change in H20 |
| Engineering | 1/26/2010 Approved per Brandon Wright |
| City Development Engineer | 1/26/10 corrections required per Cathy H. Provide electronic DWG of record in DWG format. 2/26/2010 Approved per Matt Loo |
| Landscaping | 1/26/10 approved per Cathy H. |
| General Comments: | |