Drawing of Record Submitted |
11/12/2008..revised 11/24/08 |
Electronic Drawing |
11/12/2008..revised 11/24/08 |
Final Grading Report |
11/12/2008 |
Date Scheduled |
11/18/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
11/18/2008 Corrections required per Carson Tait.. Need the back flow assembly on the landscape system tested and tagged.
11/26/08 approved per Darrin Judd.
11/16/2009 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
11/18/2008 Corrections required per Carson Tait.. Need the back flow assembly on the landscape system tested and tagged.
11/26/08 approved per Darrin Judd.
11/16/2009 Approved per Kevin Condie.. 1 year warranty |
Engineering |
11/18/2008 Corrections required per Brandon Wright..Remove all trash from DI boxes and grout pipes, remove ramps on next prop. and move dirt pile on Enterprise Drive
12/15/2008 Corrections required per Brandon Wright.. Fence and gates are not per plan
12/23/08 approver per Brandon W.
10/30/2009 Corrections required per Brandon Wright.. 1 year warranty..Cracked concrete in Northwest way on Enterprise, chipped curb on Enterprise (cracked) 6 spots, drainage ditch needs to be cleaned |
City Development Engineer |
11/18/08 corrections required per Ken B. Front stop sign is missing. Slats in chain link gates (both front and side) see approved plans for revision.
11/21/08 corrections required per Ken B. Chain link (gates) with slats are still present.
12/1/08 corrections required per Ken B. Both gates are missing.
12/15/2008 Approved per Ken Bricker
11/6/09 - 1 year warranty - Approved per Cathy H. |
Landscaping |
11/20/2008 Approved per Larry Shane
11/6/09 - 1 year warranty - Check landscaping - CORRECTIONS REQUIRED per Cathy H. 11 plans need to be replaced - DEAD. Weeds need to be removed. |
| |
General Comments: |
|