Drawing of Record Submitted |
3/31/2009..4/16/2009 |
Electronic Drawing |
3/31/2009..4/16/2009 |
Final Grading Report |
3/31/2009 |
Date Scheduled |
4/8/2009 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
4/10/09 approved per Dennis Wright.
2/3/2010 Approved per Dennis Wright..1 year warranty |
Water |
4/15/2009 Corrections required per Kevin Condie..1. Record of drawing is incorrect, make changes & resubmit. 2. Water line run under new sign-move water or move sign. 3. In line & fire line is to low need to be raise to finish grade 4. Need to have landscaping back flow tested 5. Clean & paint hydrants
4/24/2009 Approved per Kevin Condie
4/12/2010 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
4/15/2009 Corrections required per Kevin Condie..1. Record of drawing is incorrect, make changes & resubmit. 2. Water line run under new sign-move water or move sign. 3. In line & fire line is to low need to be raise to finish grade 4. Need to have landscaping back flow tested 5. Clean & paint hydrants
4/24/2009 Approved per Kevin Condie
4/12/2010 Approved per Kevin Condie.. 1 year warranty |
Engineering |
4/15/2009 Corrections required per Brandon Wright..1. Storm drain boxes 4' deep or more req steps 2. Broken clean outs on drain line southeast corner of building. 3. Missing handicap signs 4. Bumpers are missing on front stalls per plan eastside of building 5. Drawing of record wrong
4/22/2009 Approved per Brandon Wright
2/5/10 - 1 year warranty - corrections REQUIRED per Brandon W. Sewer lateral damaged - upper level. Asphalt damaged - upper level. |
City Development Engineer |
4/16/09 correction required per Cathy H . Hillside Compliance letter REQUIRED. Electronic DWG of record is off city HCN to the North. Also show size, slope, etc of storm drain pipe from CB in Southweast corner of parking lot to sidewalk drain. per Ken B. Vert ADA signage is missing. Gravel pile in parking lot. Landscape is incomplete around building (West side). Plans show privacy wall incorrect. Construction still under process. Material and equipment still on site. Wheel stops missing in front.
4/21/2009 Corrections required per Cathy H.. 1. See same comments on Elect Dwg of record, 2. Hillside compliance letter needs professional Eng stamp
4/30/2009 Approved per Cathy H
2/3/10 - 1 year warranty (check L/S only) - approved per Ken B. |
Landscaping |
24/20/2009 Approved per Larry Shane
2/3/10 - 1 year warranty (check L/S only) - approved per Ken B. |
| |