[5th District Court House]
Number: Grading-40407

Drawing of Record Submitted 1/5/2010 (6)
Electronic Drawing 1/5/2010
Final Grading Report 1/21/2010
Date Scheduled 11/12/2009
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 11/10/2009 Approved per Dennis Wright
Water 11/12/2009 Corrections required per Kevin Condie..1. No Concrete around Fire hydrant & fire riser 2. No concrete around meter box need rebar through box to City standard 3. Valve collar need to be 12" from valve can to asphalt & 12" deep 4. Need to check locate wire 5. No arrow or line size in valve collar 6. Record of Drawing 7. Clean & paint hydrant & fire riser 8. back flow on Irrig & fire line need to be test. 9. Cannot find meter at 55 North 200 West? 3/16/2010 Corrections required per Kevin Condie.. Need to finish punch list first.
Wastewater 11/12/2009 Corrections required per Kevin Condie..1. No Concrete around Fire hydrant & fire riser 2. No concrete around meter box need rebar through box to City standard 3. Valve collar need to be 12" from valve can to asphalt & 12" deep 4. Need to check locate wire 5. No arrow or line size in valve collar 6. Record of Drawing 7. Clean & paint hydrant & fire riser 8. back flow on Irrig & fire line need to be test. 9. Cannot find meter at 55 North 200 West? 3/16/2010 Corrections required per Kevin Condie.. Need to finish punch list first.
Engineering 11/17/2009 Corrections required per Brandon Wright..1. No drawing of record of Final grading report 2. Stop sign post are not City spec 3. Curb in old school zone nees to be blacked out4. Trench in Tabernacle settled 1/6/2010 Approved per Brandon Wright 1/22/2010 Approved Per Brandon Wright
City Development Engineer 11/12/09 corrections required per Ken B. Chain link security fence still in place. Contractor trailer still on site (3). Port-a-pot still on site (3). Building materials sitting in parking area. Drive bridges still on site. Trash dumpster still on site. 3/12/10 approved per Ken B.
Landscaping 11/12/09 corrections required per Ken B. Chain link security fence still in place. Contractor trailer still on site (3). Port-a-pot still on site (3). Building materials sitting in parking area. Drive bridges still on site. Trash dumpster still on site. 3/12/10 approved per Ken B.
    
General Comments: