[Fort Pierce-CRS-Clove #105]
Number: Grading-40422

Drawing of Record Submitted 12/09/2008
Electronic Drawing 12/09/2008
Final Grading Report 12/08/2008
Date Scheduled 12/10/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 12/19/2008 Approved per Kevin Condie.. Test back flow on Fire Spriklers, 12/18.. Back flow assembly on Fire Riser has been tested and tagged. 11/16/2009 Approved per Kevin Condie.. 1 year warranty
Wastewater 12/19/2008 Approved per Kevin Condie.. Test back flow on Fire Spriklers, 12/18.. Back flow assembly on Fire Riser has been tested and tagged. 11/16/2009 Approved per Kevin Condie.. 1 year warranty
Engineering 12/12/2008 Corrections required per Brandon Wright.. Fence and gates are not installed per plan.. Clean streets in front (Enterprise) 12/23/08 approverd per Brandon W. 11/17/2009 Corrections required per Brandon Wright.. 1 year warranty.. 1. repair cracks and broken face of curb along Enterprise Dr and West entrance.
City Development Engineer 12/10/08 corrections required per Ken B. Missing stop signs and vert ADA signs. General clean up is needed. Both side gates are missing. Drop-off hazard requires signage at loading dock. Guard rail is needed at loading dock ramp. Landscape is incomplete at the rear along property line. 1/14/2009 Approved per Cathy H 11/12/09 - 1 year warranty - approved per Ken B.
Landscaping 12/12/2008 Approved per Larry Shane 11/12/09 - 1 year warranty - approved per Ken B.
    
General Comments: