| Drawing of Record Submitted | 8/29/2011 |
|---|---|
| Electronic Drawing | 8/29/2011 |
| Final Grading Report | 8/29/2011 |
| Date Scheduled | 8/31/2011 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 9/01/2011 Approved per Dennis Wright 7/3/12 - 1 year warranty approved per Dennis Wright. |
| Water | 09/06/2011 Corrections required per Kevin Condie..Arrow and line size in collar.. wire ok 9/23/11 approved per Kevin C. |
| Wastewater | 09/06/2011 Corrections required per Kevin Condie..Arrow and line size in collar.. wire ok 9/23/11 approved per Kevin C. |
| Engineering | 8/31/2011 Approved per Lonnie Sullivan 7/3/12 - 1 year warranty approved per Lonnie Sullivan. |
| City Development Engineer | 9/1/2011 Approved per Wes Jenkins 7/3/12 - 1 year warranty approved per Lonnie Sullivan. |
| Landscaping | 8/31/2011 Approved per Lonnie Sullivan 7/3/12 - 1 year warranty approved per Lonnie Sullivan. |
| General Comments: | |