Drawing of Record Submitted |
6/30/2008 |
Electronic Drawing |
6/30/2008 |
Final Grading Report |
7/2/2008 |
Date Scheduled |
7/3/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
7/7/08 approved per Dennis W.
6/2/2009 Approved per Dennis Wright.. 1 year warranty |
Water |
7/11/2008 Approved per Carson Tait
6/18/2009 Approve dper Wayne M. 1 year warranty.. Check locate wire |
Wastewater |
7/11/2008 Approved per Carson Tait
6/18/2009 Approve dper Wayne M. 1 year warranty.. Check locate wire |
Engineering |
7/11/2008 Approved per Carlos Robles.. per phone call
6/15/2009 Approved per Carlos Robles 1 year warranty |
City Development Engineer |
7/3/2008 Corrections required per Cathy H.. Electronic Dwg of record -- show drainage from wall to site in southwest corner
7/15/2008 Corections required per Jay Sandberg.. Still missing solid metal doors on trash enclosure
7/16/08 corrections required per Ken B. Trash enclosure doors have not been installed.
7/17/08 approved per Ken B.
6/3/09 - 1 year warranty - check landscaping only. Approved per Ken B. |
Landscaping |
7/3/2008 Corrections require per Ken Bricker.. Trash enclosure missing solid metal doors, Need drainage easement for underground storm drain
7/15/2008 Approved per Ken Bricker
6/3/09 - 1 year warranty - check landscaping only. Approved per Ken B. |
| |
General Comments: |
|