Drawing of Record Submitted |
9/27/2010 |
Electronic Drawing |
9/27/2010 |
Final Grading Report |
9/28/2010 |
Date Scheduled |
9/29/2010 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
9/30/10 approved per Rick Madson.
8/9/11 - 1 year warranty - approved per Dennis W. |
Water |
10/01/2010 Corrections required per Kevin Condie..1. Wrong meter box need label 25x16 in size 2. Clean & paint all hydrants, form top to top of concrete 3. Concrete around boxes air vac & meter boxes
10/22/2010 Approved per Kevin Condie.. For CO's need back flow tested on Irr, & Fire springkler
8/23/2011 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
10/01/2010 Corrections required per Kevin Condie..1. Wrong meter box need label 25x16 in size 2. Clean & paint all hydrants, form top to top of concrete 3. Concrete around boxes air vac & meter boxes
10/22/2010 Approved per Kevin Condie.. For CO's need back flow tested on Irr, & Fire springkler
8/23/2011 Approved per Kevin Condie.. 1 year warranty |
Engineering |
10/4/10 approved per Brandon W. Wall Certifications from AGEC.
8/10/11 - 1 year warranty - approved per Brandon W. |
City Development Engineer |
10/8/10 corrections required per Wes Jenkins. Replace dead trees. coordinate with Cathy Hasfurther regarding hillside restoration bond.
10/26/2010 Approved per Wes Jenkins |
Landscaping |
10/8/10 corrections required per Wes Jenkins. Replace dead trees. coordinate with Cathy Hasfurther regarding hillside restoration bond.
10/27/2010 Approved per Craig Harvey |
| |
General Comments: |
|