Drawing of Record Submitted |
2/17/2010 |
Electronic Drawing |
2/17/2010 |
Final Grading Report |
2/17/2010 |
Date Scheduled |
2/18/2010 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
2/18/10 approved per Dennis W.
4/5/11 - 1 year warranty - approved per Dennis W. |
Water |
2/22/2010 Approved per Kevin COndie |
Wastewater |
2/22/2010 Approved per Kevin COndie |
Engineering |
2/22/10 corrections required per Brandon W. Waiting on bond from Watts for improvements.
6/22/2010 Approved per Brandon Wright
4/8/2011 Approved Per Brandon Wright 1 year warranty |
City Development Engineer |
2/18/2010 corrections required per Cathy H. Electronic DWG of record - does the 2" line coming from sump pump connect to street? Just shows dead end at sidewalk. per Ken B. Curb requires cutout and orifice to drain. Drainage channel is incomplete on West side of building site.
6/22/10 approved per Ken B.
4/5/11 - 1 year warranty - approved per Brett B. |
Landscaping |
2/18/10 corrections required per Ken B. Landscape is incomplete on West side of building site. Rock feature is incomplete on West side of builidng site. Front landscape is incomplete.
6/22/10 approved per Ken B.
4/5/11 - 1 year warranty - approved per Brett B. |
| |
General Comments: |
|