| Drawing of Record Submitted | 5/18/2009..revised 6/9/09 |
|---|---|
| Electronic Drawing | 5/18/2209..revised 6/9/09 |
| Final Grading Report | 5/15/2009 |
| Date Scheduled | 5/18/2009 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 5/21/09 approved per Dennis W. 2/26/2010 Approved per Dennis Wright 1 year warranty |
| Water | 5/21/09 correction required per Kevin C. Fire line needs to be cut off at valve and capped. Check backflow on Irr system. 5/26/2009 Corrections required per Carson Tait.. Need to have a concrete pad poured around the meter box. Need as as-built drawing.Need trhe hose bib cut off that is in the valve box 5/29/2009 Approved per Kevin Condie..per Phone Call @ 9:30 6/9/2009 Comments.. ok by Scott Taylor-concrete around meter box should have been done on Final of project & tap is a after back flow. 3/10/2010 Approved per Kevin Condie.. 1 year warranty |
| Wastewater | 5/21/09 correction required per Kevin C. Fire line needs to be cut off at valve and capped. Check backflow on Irr system. 5/26/2009 Corrections required per Carson Tait.. Need to have a concrete pad poured around the meter box. Need as as-built drawing.Need trhe hose bib cut off that is in the valve box 5/29/2009 Approved per Kevin Condie..per Phone Call @ 9:30 6/9/2009 Comments.. ok by Scott Taylor-concrete around meter box should have been done on Final of project & tap is a after back flow. 3/10/2010 Approved per Kevin Condie.. 1 year warranty |
| Engineering | 5/19/09 approved per Brandon W. 2/25/10 - 1 year warranty - Approved per Brandon W. |
| City Development Engineer | 5/21/09 approved per Cathy H. Electronic DWG of record, okay. 2/25/10 - 1 year warranty - Just Check Landscaping - Approved per Ken B. |
| Landscaping | 5/21/09 approved per Cathy H. 2/25/10 - 1 year warranty - Just Check Landscaping - Approved per Ken B. |
| General Comments: | |