| Drawing of Record Submitted | 7/22/2009 |
|---|---|
| Electronic Drawing | 7/22/2009 |
| Final Grading Report | 7/22/2009 |
| Date Scheduled | 7/27/2009 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 7/27/09 approved per Dennis Wright. 5/5/2010 Approved per Dennis Wright.. 1 year warranty |
| Water | 7/27/2009 Corrections required per Kevin Condie.. Back flow on fire riser @ out side landscaping needs to be tested. Tracer wire from valve can to riser on building won't work. 7/28/2009 Approved per Kevin Condie 6/8/2010 Approved per Darrin Judd.. 1 year warranty..wire good |
| Wastewater | 7/27/2009 Corrections required per Kevin Condie.. Back flow on fire riser @ out side landscaping needs to be tested. Tracer wire from valve can to riser on building won't work. 7/28/2009 Approved per Kevin Condie 6/8/2010 Approved per Darrin Judd.. 1 year warranty..wire good |
| Engineering | 7/27/09 approved per Brandon W. 5/6/10 - 1 year warranty approved per Brandon W. |
| City Development Engineer | 7/27/09 approved per Ken B. 5/6/10 - 1 year warranty approved per Cathy H. |
| Landscaping | 7/27/09 approved per Ken B. 5/6/10 - 1 year warranty approved per Ken B. |
| General Comments: | |