Drawing of Record Submitted |
12/29/2008 |
Electronic Drawing |
12/29/2008 |
Final Grading Report |
12/29/2008 |
Date Scheduled |
12/30/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
01/02/2009 Corrections required per Darrin Judd.. Back flow on outside landscaping needs to be tested and tagged.
1/27/2009 Approved per Carson Tait
12/14/2009 Approved per Kevin Condie.. 1 year warranty wire ok |
Wastewater |
01/02/2009 Corrections required per Darrin Judd.. Back flow on outside landscaping needs to be tested and tagged.
1/27/2009 Approved per Carson Tait
12/14/2009 Approved per Kevin Condie.. 1 year warranty wire ok |
Engineering |
1/9/08 corrections required per Brandon W. Rocks in 10' clear zone. Fence not installed. Dirt on next lot needs to be removed. Letter need for 30 day time frame on fence and dirt.
1/15/2009 Approved Brandon Wright
11/17/2009 Approved per Brandon Wright.. 1 year warranty |
City Development Engineer |
12/30/08 approved per Cathy H. Electronic DWG of record okay.
11/12/09 - 1 year warranty - approved per Ken B. |
Landscaping |
12/31/2008 Corrections required Per Laura Taylor: Replace broken street tree at corner of progress & Quality. Plant shrubs in area in front of main entry door along street-see landscape plan sheet C1.10. Shrub density seems low compared to landscape plan-verify number of shrubs planted matches plan.
1/14/2009 Approved per Laura Taylor
11/12/09 - 1 year warranty - approved per Ken B. |
| |
General Comments: |
|