[Fort Pierce/Morley Industrail Bldg #92]
Number: Grading-40719

Drawing of Record Submitted 4/22/2009..revise 4/30/09
Electronic Drawing 4/22/2009..revised 4/30/09
Final Grading Report 3/17/2009
Date Scheduled 4/23/2009
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 4/27/2009 Corrections required per Carson Tait.. Need a concrete valve collar around the valve box in the street. Need to have the back flow assmebly on the irrigation system tested and tagged. 5/4/2009 Approved per Kevin Condie.. Need to fix Collar, will be fixed by next Friday per Bryce. 3/10/2010 Corrections required per Kevin Condie.. 1 year warranty.. No arrow or line size in valve collar
Wastewater 4/27/2009 Corrections required per Carson Tait.. Need a concrete valve collar around the valve box in the street. Need to have the back flow assmebly on the irrigation system tested and tagged. 5/4/2009 Approved per Kevin Condie.. Need to fix Collar, will be fixed by next Friday per Bryce. 3/10/2010 Corrections required per Kevin Condie.. 1 year warranty.. No arrow or line size in valve collar
Engineering 4/24/2009 Approved per Brandon Wright 2/28/10 - 1 year warranty - Approved per Brandon W.
City Development Engineer 4/22/2009 Correcitons required Ken Bricker.. 1. Require "One Way" signage w/arrows on asphalt as per plans. 4/29/09 approved per Ken B. 2/26/2010 - 1 year warranty - Just Check Landscaping - APPROVED per Ken B.
Landscaping 4/27/2009 Approved per Pam Klotz 2/26/2010 - 1 year warranty - Just Check Landscaping - APPROVED per Ken B.
    
General Comments: