Drawing of Record Submitted |
4/2/2009..revised 4/20/09 |
Electronic Drawing |
4/2/2009..revised 4/20/09 |
Final Grading Report |
4/2/2009 |
Date Scheduled |
4/06/2209 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
4/8/2009 Approved per Carson Tait
2/26/2010 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
4/8/2009 Approved per Carson Tait
2/26/2010 Approved per Kevin Condie.. 1 year warranty |
Engineering |
4/9/2009 Approved per Brandon Wright
2/5/10 - 1 year warranty - corrections REQUIRED per Brandon W. Settling along DI box. Curb cracked. |
City Development Engineer |
4/6/2009 Corrections required per Cahty H..1. Elec Dwg of record needs to be clarified. Too much info being over written and nothing pops up on Dwg record tab. Both on paper copy & Elec copy, remove language of proposed, install etc. Things should be at location installed, Missing vertical Ada signage.
4/10/2009 Approved per Cathy H
2/3/10 - 1 year warranty (check L/S only) - approved per Ken B. |
Landscaping |
4/16/2009 Approved per Laura Taylor
2/3/10 - 1 year warranty (check L/S only) - approved per Ken B. |
| |
General Comments: |
|