Drawing of Record Submitted |
4/27/2012 |
Electronic Drawing |
4/27/2012 |
Final Grading Report |
4/30/2012 |
Date Scheduled |
5/1/2012 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
5/2/12 approved per Dennis W.
3/7/13 - 1 year warranty - approved per Dennis W. |
Water |
5/2/12 approved per Kevin C.
5/02/2012 Approved per Kevin Condie.. 1 year warranty
3/11/2013 orrections required per CarsonTait.. 1 yr warranty.. Neeed re-bar in the meter box. Need to have back flow assembly tested and tagged. |
Wastewater |
5/2/12 approved per Kevin C.
5/02/2012 Approved per Kevin Condie.. 1 year warranty
3/11/2013 orrections required per CarsonTait.. 1 yr warranty.. Neeed re-bar in the meter box. Need to have back flow assembly tested and tagged. |
Engineering |
5/1/12 approved per Brandon W.
3/12/2013 Approved per Brandon Wright.. 1 year warranty |
City Development Engineer |
5/01/2012 Approved per Wes Jenkins
3/12/2013 Approved per Brandon Wright.. 1 year warranty |
Landscaping |
5/01/2012 Approved per Wes Jenkins
3/12/2013 Approved per Per Brandon Wright.. 1 year warranty |
| |
General Comments: |
|