| Drawing of Record Submitted | 4/27/2012 |
|---|---|
| Electronic Drawing | 4/27/2012 |
| Final Grading Report | 4/30/2012 |
| Date Scheduled | 5/1/2012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 5/2/12 approved per Dennis W. 3/7/13 - 1 year warranty - approved per Dennis W. |
| Water | 5/2/12 approved per Kevin C. 5/02/2012 Approved per Kevin Condie.. 1 year warranty 3/11/2013 orrections required per CarsonTait.. 1 yr warranty.. Neeed re-bar in the meter box. Need to have back flow assembly tested and tagged. |
| Wastewater | 5/2/12 approved per Kevin C. 5/02/2012 Approved per Kevin Condie.. 1 year warranty 3/11/2013 orrections required per CarsonTait.. 1 yr warranty.. Neeed re-bar in the meter box. Need to have back flow assembly tested and tagged. |
| Engineering | 5/1/12 approved per Brandon W. 3/12/2013 Approved per Brandon Wright.. 1 year warranty |
| City Development Engineer | 5/01/2012 Approved per Wes Jenkins 3/12/2013 Approved per Brandon Wright.. 1 year warranty |
| Landscaping | 5/01/2012 Approved per Wes Jenkins 3/12/2013 Approved per Per Brandon Wright.. 1 year warranty |
| General Comments: | |