| Drawing of Record Submitted | 8/26/2009..revised 9-1-09 |
|---|---|
| Electronic Drawing | 8/26/2009..revised 9-1-09 |
| Final Grading Report | 8/26/2009 |
| Date Scheduled | 8/27/2009 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 8/31/2009 Corrections required per Kevin Condie.. Test back flow on Fire system 9/2/2009 Approved per Kevin Condie |
| Wastewater | 8/31/2009 Corrections required per Kevin Condie.. Test back flow on Fire system 9/2/2009 Approved per Kevin Condie |
| Engineering | 8/27/2009 Approved per Brandon Wright 7/8/10 - 1 year warranty - approved per Brandon W. |
| City Development Engineer | 8/27/09 corrections required per Cathy H. Electronic DWG of record - remove language such as new, install, etc (change verbage on type of retaining wall). 9/1/2009 Approved per Cathy H 7/12/10 - 1 year warranty - approved per Cathy H. |
| Landscaping | 8/27/09 approved per Ken B. 7/12/10 - 1 year warranty - approved per Cathy H. |
| General Comments: | |