Drawing of Record Submitted |
7/17/2009..revised 7/27/09 |
Electronic Drawing |
7/17/2009..revised 7/27/09 |
Final Grading Report |
7/17/2009 |
Date Scheduled |
7/20/2009 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
7/20/2009 Approved per Dennis Wright
5/5/2010 Approved per Dennis Wright 1 year warranty |
Water |
7/21/2009 Corrections required per Kevin Condie.. Clean & paint hydrant, contractor need to check valve & make some they are open, back flow on Irr need to be 12" above ground & tested, For C0 back flow on Irr & Fire sprinkler need to be tested.
7/28/2009 Approved per Kevin Condie
6/10/2010 Approved per Darrin Judd.. 1 year waranty |
Wastewater |
7/21/2009 Corrections required per Kevin Condie.. Clean & paint hydrant, contractor need to check valve & make some they are open, back flow on Irr need to be 12" above ground & tested, For C0 back flow on Irr & Fire sprinkler need to be tested.
7/28/2009 Approved per Kevin Condie
6/10/2010 Approved per Darrin Judd.. 1 year waranty |
Engineering |
7/27/2009 Approved per Carlos Robles
5/6/10 - 1 year warranty approved per Brandon W. |
City Development Engineer |
7/20/09 corrections required per Cathy H. Electronic DWG of record - show top and bottom elevations of retaining walls. per Ken B. Stop sign missing. ADA vertical signage is missing. Loading dock is missing handrail on one side of dock - strongly recommended.
7/29/09 approved per Ken B.
5/6/10 - 1 year warranty approved per Cathy H. |
Landscaping |
7/20/09 approved per Ken B.
5/6/10 - 1 year warranty approved per Ken B. |
| |
General Comments: |
|