Drawing of Record Submitted |
4/30/2009.. revisaed 5/1/2009 |
Electronic Drawing |
4/30/2009 (E-mailed to Cathy) |
Final Grading Report |
4/30/2009 |
Date Scheduled |
5/5/2009 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
5/1/2009 Approved per Dennis Wright |
Water |
5/5/2009 Corrections required per Carson Tait..Need to have the locate wire brought up properly through the top of the valve can riser. Need direction of flow arrows and line size cut into the valve box collars. Need to cut and cap hose bibs or install vacuum breakers. Need back flow assembly test reports (2) need to raise the rip assembly to meet installation spec. |
Wastewater |
5/5/2009 Corrections required per Carson Tait..Need to have the locate wire brought up properly through the top of the valve can riser. Need direction of flow arrows and line size cut into the valve box collars. Need to cut and cap hose bibs or install vacuum breakers. Need back flow assembly test reports (2) need to raise the rip assembly to meet installation spec. |
Engineering |
5/5/2009 Corrections required per Carlos Robles..Project not finish.. construction debris & extra soil must be removed from City property |
City Development Engineer |
5/5/09 corrections required per Cathy H. Electronic DWG of Record OK. per Ken B. Section of perimeter fence is incomplete. Hand railing is incomplete. Trash in detention basin. Safety rail is needed at upper parking lot. Security gate is missing. Curb shoulders need repaired on W/W Dr. Sidewalk ends missing ramps (Dirt). |
Landscaping |
5/5/09 approved per Shane Moore. |
| |
General Comments: |
|