Drawing of Record Submitted |
9/21/2009 |
Electronic Drawing |
9/21/2009 |
Final Grading Report |
9/21/2009 |
Date Scheduled |
9/22/2009 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
9/28/09 corrections required per Kevin C. Not Ready. |
Wastewater |
9/28/09 corrections required per Kevin C. Not Ready. |
Engineering |
9/24/2009 Corrections required per Brandon Wright.. Monuments are not installed or stamped. |
City Development Engineer |
9/24/09 corrections required per Cathy H. 10% warranty bond. Electronic DWG of record - label all water valve and water line information. Show drainage ditch information. Along roadway, show sewer information at station 83+00 as shown on approved plans. DWG of record paper copy - show drainage ditch information, sewer at station 83+00, label all water valves and water lines, place utility and paving on same sheets (combine sheets 3&4 with other sheets). |
Landscaping |
9/24/09 approved per Cathy H. |
| |
General Comments: |
|