[Painted Desert Professional Plaza Phase 1]
Number: Grading-40981

Drawing of Record Submitted 4/28/2009..revised 4/30/09
Electronic Drawing 4/28/2009..revised 4/30/09
Final Grading Report 4/27/2009
Date Scheduled 4/29/2009
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/4/2009 Corrections required per Carson Tait.. Need to cut off unused stub line and service line. Need to install a Vacuum breaker on the hose bib. Turn the Fire hydrant. Need back flow test reports. 5/5/2009 Approved Per Carson Tait 4/12/2010 Approved per Kevin Condie.. 1 year warranty
Wastewater 5/4/2009 Corrections required per Carson Tait.. Need to cut off unused stub line and service line. Need to install a Vacuum breaker on the hose bib. Turn the Fire hydrant. Need back flow test reports. 5/5/2009 Approved Per Carson Tait 4/12/2010 Approved per Kevin Condie.. 1 year warranty
Engineering 4/30/2009 Approved per Carlos Robles 3/1/10 - 1 year warranty - corrections required per Brandon W. Missing one way signs, stop signs, and handicap signs.
City Development Engineer 4/29/09 corrections required per Cathy H. See comments on paper copy of DWG of record (Remove new if installed, show phase lines, show contours to detention basin). Make sure corrections on Electronic DWG of Record. per Ken B. Missing dirt slope from sidewalk end. Full length/depth curb crack (front). Full length/depth curb crack (front). Missing both steel doors on trash enclosure. 5/1/2009 Approved per Cathy H.. Electronic Dwg of record- ok 2/26/2010 - 1 year warranty - Just Check Landscaping - APPROVED per Ken B.
Landscaping 5/5/09 approved per Larry Shane. 2/26/2010 - 1 year warranty - Just Check Landscaping - APPROVED per Ken B.
    
General Comments:
Note:4-28-09 Per Cathy, Phase 1 only of Final (3 Phases total for project.)