| Drawing of Record Submitted | 6/29/2009 |
|---|---|
| Electronic Drawing | 6/29/2009 |
| Final Grading Report | 6/29/2009 |
| Date Scheduled | 6/30/2009 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 6/29/2009 Approved per Dennis Wright.. Phase 1 Only 6/10/2010 Approved per Dennis Wright..1 year warranty |
| Water | 7/1/2009 Correctionsrequired per Kevin Condie.. 1. No arrow & line sizes in collars, 2. Need concrete collars around hydrant & meter 3. Test back flow 4. Clean & paint hydrant 7/8/2009 Approved Per Darrin Judd.. Still need to test & tag four riser we'll pick it up on the CO. 6/9/2010 Approved per Darrin Judd.. 1 year warranty wire good |
| Wastewater | 7/1/2009 Correctionsrequired per Kevin Condie.. 1. No arrow & line sizes in collars, 2. Need concrete collars around hydrant & meter 3. Test back flow 4. Clean & paint hydrant 7/8/2009 Approved Per Darrin Judd.. Still need to test & tag four riser we'll pick it up on the CO. 6/9/2010 Approved per Darrin Judd.. 1 year warranty wire good |
| Engineering | 7/2/2009 Approved per Brandon Wright 6/9/2010 Approved per Brandon Wright..1 year warranty |
| City Development Engineer | 6/30/09 corrections required per Cathy H. Electronic DWG of record - remove striping if not installing. Per Bob N - okay not to stripe. Finish asphalt on North side per plan (ASPHALT COMPLETE AS OF 7/2/09). Need 10% warrant bond (1800 N). per Ken B. Missing stop sign at access exit. Remove all building materials on-site AND off-site (sitting on outside against East privacy wall). 7/7/09 approved per Cathy H. 6/8/10 - 1 year warranty - approved per Ken B |
| Landscaping | 6/30/09 approved per Ken B. 6/8/10 - 1 year warranty - approved per Ken B |
| General Comments: | |