Drawing of Record Submitted |
6/29/2009 |
Electronic Drawing |
6/29/2009 |
Final Grading Report |
6/29/2009 |
Date Scheduled |
6/30/2009 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
6/29/2009 Approved per Dennis Wright.. Phase 1 Only
6/10/2010 Approved per Dennis Wright..1 year warranty |
Water |
7/1/2009 Correctionsrequired per Kevin Condie.. 1. No arrow & line sizes in collars, 2. Need concrete collars around hydrant & meter 3. Test back flow 4. Clean & paint hydrant
7/8/2009 Approved Per Darrin Judd.. Still need to test & tag four riser we'll pick it up on the CO.
6/9/2010 Approved per Darrin Judd.. 1 year warranty wire good |
Wastewater |
7/1/2009 Correctionsrequired per Kevin Condie.. 1. No arrow & line sizes in collars, 2. Need concrete collars around hydrant & meter 3. Test back flow 4. Clean & paint hydrant
7/8/2009 Approved Per Darrin Judd.. Still need to test & tag four riser we'll pick it up on the CO.
6/9/2010 Approved per Darrin Judd.. 1 year warranty wire good |
Engineering |
7/2/2009 Approved per Brandon Wright
6/9/2010 Approved per Brandon Wright..1 year warranty |
City Development Engineer |
6/30/09 corrections required per Cathy H. Electronic DWG of record - remove striping if not installing. Per Bob N - okay not to stripe. Finish asphalt on North side per plan (ASPHALT COMPLETE AS OF 7/2/09). Need 10% warrant bond (1800 N). per Ken B. Missing stop sign at access exit. Remove all building materials on-site AND off-site (sitting on outside against East privacy wall).
7/7/09 approved per Cathy H.
6/8/10 - 1 year warranty - approved per Ken B |
Landscaping |
6/30/09 approved per Ken B.
6/8/10 - 1 year warranty - approved per Ken B |
| |
General Comments: |
|