Drawing of Record Submitted |
8/13/2009 |
Electronic Drawing |
8/13/2009 |
Final Grading Report |
8/13/2009 |
Date Scheduled |
8/17/2009 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
8/17/09 approved per Dennis Wright. Trench inspected by other. OK for inspection.
6/3/2010 Approved per Dennis Wright.. 1 year warranty |
Water |
8/17/09 corrections required per Kevin C. Need concrete around meter box with rebar. Need to check all valve, open. Backflow or irrigation and fire system need to be tested.
8/21/09 corrections required per Kevin C. No concrete around meter box. Finish punch list.
8/25/09 approved per Kevin C
6/8/2010 Approved per Darrin Judd..1 year warranty.. wire good
7/6/2010 Approved per Kevin Condie.. 1 year warranty |
Wastewater |
8/17/09 corrections required per Kevin C. Need concrete around meter box with rebar. Need to check all valve, open. Backflow or irrigation and fire system need to be tested.
8/21/09 corrections required per Kevin C. No concrete around meter box. Finish punch list.
8/25/09 approved per Kevin C
6/8/2010 Approved per Darrin Judd..1 year warranty.. wire good
7/6/2010 Approved per Kevin Condie.. 1 year warranty |
Engineering |
8/18/09 approved per Brandon W.
6/7/10 - 1 year warranty approved per Brandon W. |
City Development Engineer |
8/14/09 corrections required per Ken B. Recommend warning signs or reflector plates at both O/H power poles, on Ease side (see map). Electronic DWG of record OK.
8/21/09 approved per Ken B.
6/4/10 - 1 year warranty approved per Ken B |
Landscaping |
8/14/09 approved per Ken B.
6/4/10 - 1 year warranty approved per Ken B |
| |
General Comments: |
|