| Drawing of Record Submitted | 8/13/2009 |
|---|---|
| Electronic Drawing | 8/13/2009 |
| Final Grading Report | 8/13/2009 |
| Date Scheduled | 8/17/2009 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 8/17/09 approved per Dennis Wright. Trench inspected by other. OK for inspection. 6/3/2010 Approved per Dennis Wright.. 1 year warranty |
| Water | 8/17/09 corrections required per Kevin C. Need concrete around meter box with rebar. Need to check all valve, open. Backflow or irrigation and fire system need to be tested. 8/21/09 corrections required per Kevin C. No concrete around meter box. Finish punch list. 8/25/09 approved per Kevin C 6/8/2010 Approved per Darrin Judd..1 year warranty.. wire good 7/6/2010 Approved per Kevin Condie.. 1 year warranty |
| Wastewater | 8/17/09 corrections required per Kevin C. Need concrete around meter box with rebar. Need to check all valve, open. Backflow or irrigation and fire system need to be tested. 8/21/09 corrections required per Kevin C. No concrete around meter box. Finish punch list. 8/25/09 approved per Kevin C 6/8/2010 Approved per Darrin Judd..1 year warranty.. wire good 7/6/2010 Approved per Kevin Condie.. 1 year warranty |
| Engineering | 8/18/09 approved per Brandon W. 6/7/10 - 1 year warranty approved per Brandon W. |
| City Development Engineer | 8/14/09 corrections required per Ken B. Recommend warning signs or reflector plates at both O/H power poles, on Ease side (see map). Electronic DWG of record OK. 8/21/09 approved per Ken B. 6/4/10 - 1 year warranty approved per Ken B |
| Landscaping | 8/14/09 approved per Ken B. 6/4/10 - 1 year warranty approved per Ken B |
| General Comments: | |