[Millcreek Power Plant Expansion]
Number: Grading-41091

Drawing of Record Submitted 5/5/2010..5/10/2010
Electronic Drawing 5/5/2010..5/10/2010
Final Grading Report 5/4/2010
Date Scheduled 5/6/2010
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 5/9/2010 Approved per Phillip Soleman.. Kirkland has P/O on trial fence- will be done 4/5/11 - 1 year warranty - approved per Dennis W.
Water 5/10/2010 Corrections required per Kevin Condie.. Turn Fire hydrant on South west corner, turn 180°, drawing of record is wrong, arrow & line sizes in valve collars, check all valves for open, 2-RP ned to be tested 5/19/2010 Corrections required per Kevin Condie Need to check one RP-4" 5/19/10 approved per Kevin C.
Wastewater 5/10/2010 Corrections required per Kevin Condie.. Turn Fire hydrant on South west corner, turn 180°, drawing of record is wrong, arrow & line sizes in valve collars, check all valves for open, 2-RP ned to be tested 5/19/2010 Corrections required per Kevin Condie Need to check one RP-4" 5/19/10 approved per Kevin C.
Engineering 5/10/2010 Approved per Brandon Wright.. Note: N.O.T and silt fence to be filed and removed at substantial completion 4/11/2011 Approved per Brandon Wright 1 year warranty
City Development Engineer 5/6/10 corrections required per Cathy H . Electronic DWG of Record - Need to show outlet elevations at end of storm drains coming through erosion control berm. Per Ken B - Security fence is not complete. 5/12/2010 Approved per Ken Bricker 4/5/11 - 1 year warranty - approved per Brett B.
Landscaping 5/7/10 corrections required per Zac Koceja - Trail paving is complete but the required fencing and trail signs have not been installed. Met with Phillip Solomon two weeks ago and he said that the City (Energy Services) would pay to have the remaining fence and signs installed. Park Planning (Zac Koceja) will order the required signs next week. I am not sure how soon the fence will be installed. I will follow up with Phillip S. the beginning of next week. 5/7/10 approved per Zac Koceja with following conditions. Trail to remain closed until fencing and signs are installed. 5/27/10 approved per Zac Koceja. Energy services has committed to install the required fencing and signage before trail segment is to be re-opened. 4/5/11 - 1 year warranty - approved per Brett B.
    
General Comments: