Drawing of Record Submitted |
12/8/2009 |
Electronic Drawing |
12/08/2009 |
Final Grading Report |
12/08/2009 |
Date Scheduled |
12/09/2009 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
12/17/2009 Approved per Kevin Condie.. Sewer only..water ok |
Wastewater |
12/17/2009 Approved per Kevin Condie.. Sewer only..water ok |
Engineering |
12/17/2009 Correctiosn required per Brandon Wright.. Complete Cathy's list
12/18/2009 Approved per Brandon Wright |
City Development Engineer |
12/14/09 corrections required per Cathy H. Electronic DWG of Record - on sheet 3, need to show match line location to sheet 4. Add match line location to sheet 4. Also sheet 5 has wrong match line pointing to sheet 6. Sewer stubbed to North on Sheet 6. Extension of line should be sheet 7.
12/18/09 approved per Cathy H. |
Landscaping |
12/14/09 approved per Cathy H. |
| |
General Comments: |
|