[Fort Pierce #3/Gary Knight Development]
Number: Grading-41210

Drawing of Record Submitted 9/10/2010
Electronic Drawing 9/10/2010
Final Grading Report
Date Scheduled 9/14/2010
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 9/14/2010 Corrections required per Kevin Condie..1. Aub on irr sprinkler system need to be 6" higher than outlet on drip system 2. Need arrow & line size in concrete collar 3. Need hose bibb vaccum breaker as all hose bibbs 4. Test back flow on fire sprinkler system 5. Need to turn on valve in street, doesn't look like fire line is done inside building 9/29/2010 Approved per Kevin Condie 8/22/11 - 1 year warranty - approved per Kevin C.
Wastewater 9/14/2010 Corrections required per Kevin Condie..1. Aub on irr sprinkler system need to be 6" higher than outlet on drip system 2. Need arrow & line size in concrete collar 3. Need hose bibb vaccum breaker as all hose bibbs 4. Test back flow on fire sprinkler system 5. Need to turn on valve in street, doesn't look like fire line is done inside building 9/29/2010 Approved per Kevin Condie 8/22/11 - 1 year warranty - approved per Kevin C.
Engineering 9/14/2010 Corrections required per Brandon Wright.. No Final grading report, Door missing on dumpster enclosure, landscape not complete 9/27/2010 Approved per Brandon Wright 8/9/11 - 1 year warranty - approved per Brandon W.
City Development Engineer 9/15/2010 Corrections required Per Wes Jenkins.. Garbage enclosure doors missing 9/27/2010 Approved per Wes Jenkins.. Please note: Eng needs an Electronic Dwg of Record of site plan in Autocade formate with HCN network.
Landscaping 9/15/2010 Corrections Required per Brett Bingham.. Landscape not complete approved plans show 7 tress along roadway 7/27/2010 Corrections required per Brett Bingham.. Landscape still not complete. Next Parks inspection to be done by Craig Harvey in the Planning Dept 9/27/2010 Approved per Craig Harvey
    
General Comments: